Standedge Tunnels – Visited by Ojay, Solo1 and 99%

(PIC HEAVY)

This epic trip comprised 2 explores, S.L and 99% Kayaking it through the canal tunnel and myself on foot, both ways and needless to say I’ve never had as much exercise in one night!

After seeing them both disappear into the tunnel it was my turn to join them further along which once again presented its challenges

After around 20 minutes of tunnelling it, I finally met up with the 2 of them alongside the canal tunnel where we shared a few words before continuing the gruelling 3.6 mile walk (7.2 on foot Ojay, 3.6 kayak/3.6 Walk S.L/99%)





It was to be at least another 20 minutes before we met up again, S.L. providing the much needed coffee break.

An hour or so later we all arrived at the Marsden portal where we finally met up for the long walk back to Diggle, oh and not forgetting the photos on the way, Enjoy

Some History:





In November 1846, work started on the first of three Standedge railway tunnels. It was completed two years later at a cost of £201,608. Again the work was carried out by candlelight and over 150,000 lbs of candles were used, costing £3,618. The full length of the railway tunnel was 3 miles 60 yards.

The line opened for business on 1st August 1849, when the L & N W Railway Company issued its first timetable for Saddleworth.

A second railway tunnel was finished in 1870 and a third one in 1894. Standedge is unique in having four tunnels - three railways and one canal -almost parallel to each other under the moors.

The canal and railway tunnels remain one of the greatest feats of British engineering because of the enormous task of carrying water through the Standedge hills.

In 1847 a large water wheel was erected at Diggle Mill, the brainchild of William Broadbent.

The Standedge Canal Tunnel is the longest, highest and deepest canal tunnel in Britain. It runs under the Pennine Hills for a distance of 5, 029 meters to join the West Yorkshire village of Marsden to the Greater Manchester village of Diggle.

It was initially estimated that the work would take 5 years, but in the end it was 16 years before the longest canal tunnel in Britain was to open.

With the railways taking traffic away from the canals, the Huddersfield Canal fell into slow decline.

The last commercial boat passed through the tunnel in 1921. The canal was officially closed in 1944 although a boat, "Ailsa Craig", struggled through in 1948, being the last boat to make a complete passage along the canal before the lock gates were removed in the 1950s.
A maintenance boat remained on the summit level for carrying out inspections and basic maintenance within Standedge Tunnel. In 1961 and 1962 this boat took groups of canal enthusiasts through the tunnel. In time, however, parts of the roof became unstable and some sections collapsed, making navigation impossible.

By the time funding eventually became available to restore the tunnel, it had become a major operation, with some sections needing to be stabilised with rock bolts and others to be lined with concrete. 10,000 tons of silt and 3,000 tons of fallen rocks had to be removed.

On May 1st, 2001 the tunnel was open to boats once more, after restoration costing more than five million pounds. When the tunnel was originally opened in 1811, the cost of construction had been £123,804!

Today the 1894 tunnel is still used as an emergency escape route and for emergency vehicles to pass through if and when required.


West Portal - DIGGLE



East Portal – MARSDEN





One of the many links between the 2 Service Tunnels



Some of the many tunnels down to the railway/canal











One of the many Drains within the tunnels



Down by the canal at various points....







Some interesting Archway at the half-way point where both tunnels merge briefly



Airshaft, approx 600+ ft below saddleworth Moor





The Tunnel





The Three of us



The end marker


Thanks for looking:thumb

Last edited by Ojay; 11-02-2010 at 22:40.
Closed Thread

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off




Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
vBulletin Skin developed by: vBStyles.com
© 2008-2015. Photographs and text are copyright and the property of the poster unless otherwise stated, and should not be used without express written permission.
Any opinions stated by users of this forum are NOT those of the site owners, each poster takes FULL responsibility for their own posts.