NorthWest Exploration Forum  
FAQ Calendar Mark Forums Read
Go Back   NorthWest Exploration Forum > Site Reports > Industrial & Commercial
Reload this Page Maenofferen Slate mine and quarry, Wales 2012
Industrial & Commercial Mills, Foundries, Factories, Warehouses, Docks etc.

Reply
 
Thread Tools Display Modes
Maenofferen Slate mine and quarry, Wales 2012
(#1)
Old
the kwan is Offline
Easily Led
 
Posts: 180
Join Date: Jan 2012
Location: wirral merseyside
Default Maenofferen Slate mine and quarry, Wales 2012 - 06-08-2012, 10:40

Visited with Walsh and Mr Xan Asmodi, we had a wuvverly time in the mills and workshops at Maenofferen even despite bad weather the history below is lifted straight from walsh's report...shouts to walsh for all the research.

This was my first trip out with a gopro and just finding my feet with it..I like the gopros video quality over the Kodak playsport..it is early days..so take a look.

http://youtu.be/Z6s8Eq877uk

History Maenofferen was first worked for slate by men from the nearby Diphwys quarry shortly after 1800. By 1848 slate was being shipped via the Ffestiniog Railway, but traffic on the railway ceased in 1850. In 1857 traffic resumed briefly and apart from a gap in 1865, a steady flow of slate was dispatched via the railway. The initial quarry on the site was known as the David Jones quarry which was the highest and most easterly of what became the extensive Maenofferen complex. In 1861 the Maenofferen Slate Quarry Co. Ltd. was incorporated, producing around 400 tons of slate that year. The company leased a wharf at Porthmadog in 1862 and shipped 181 tons of finished slate over the Ffestiniog Railway the following year. During the nineteenth century the quarry flourished and expanded, extending its workings underground and further downhill towards Blaenau Ffestiniog. By 1897 it employed 429 people with almost half of those working underground. The Ffestiniog Railway remained the quarry's major transport outlet for its products, but there was no direct connection from it to the Ffestiniog's terminus at Duffws. Instead slate was sent via the Rhiwbach Tramway which ran through the quarry. This incurred extra shipping costs that rival quarries did not have to bear. In 1908 the company leased wharf space at Minffordd, installing turntables and siding to allow finished slates to be transshipped to the standard gauge railway there. In 1920 the company solved its high shipping costs by building a new incline connecting its mill to the Votty & Bowydd quarry and reaching agreement to ship its products via that company's incline connection to the Ffestiniog Railway at Duffws. In 1928 Maeofferen purchased the Rhiwbach quarry, continuing to work it and use its associated Tramway until 1953. When the Ffestiniog Railway ceased operation in 1946, Maeofferen leased a short length of the railway's tracks between Duffws station and the interchange with the LMS railway, west of Blaenau Ffestiniog. Slate trains continued to run over this section until 1962, Maenofferen then becoming the last slate quarry to use any part of the Ffestiniog Railway's route. From 1962 slate was shipped from the quarry by road, although the internal quarry tramways including stretches of the Rhiwbach tramway continued in use until at least the 1980s. The quarry was purchased by the nearby Llechwedd quarry in 1975 together with Bowydd, which also incorporated the old Votty workings: these are owned by the Maenofferen Company. Underground production at Maenofferen ceased during November 1999 and with it the end of large-scale underground working for slate in north Wales. Production of slate recommenced on the combined Maenofferen site, consisting of "untopping" underground workings to recover slate from the supporting pillars of the chambers. Material recovered from the quarry tips will also be recovered for crushing and subsequent use.

The Cave monster outside the mill buildings



In one of the workshops, decrepid but beautiful



A battery Kart, thomas's cousin




on the workbench



and on the wall




poor old Battery kart




Last job before redundancy

a crankshaft




Big wheels keep on turning



Going loco



Reply With Quote
(#2)
Old
Snake Oil's Avatar
Snake Oil is Offline
Donuts-я-Us
 
Posts: 512
Join Date: Mar 2011
Location: Atherton
Default 06-08-2012, 21:46

thats mint, looks like theres loads of stuff left
Reply With Quote
(#3)
Old
martymarty's Avatar
martymarty is Offline
Senior Member
 
Posts: 128
Join Date: Apr 2010
Location: Rhosesmor Mold North Wales
Default 06-08-2012, 23:48

Aww no underground pics??


nid oes bradwr yn y ty hwn
Reply With Quote
(#4)
Old
the kwan is Offline
Easily Led
 
Posts: 180
Join Date: Jan 2012
Location: wirral merseyside
Default 07-08-2012, 00:55

Quote:
Originally Posted by martymarty View Post
Aww no underground pics??

Maenofferen PT II
http://nwex.co.uk/showthread.php?p=148551#post148551


thanks for the comments
Reply With Quote
Reply

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off




Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
vBulletin Skin developed by: vBStyles.com
© 2008-2015. Photographs and text are copyright and the property of the poster unless otherwise stated, and should not be used without express written permission.
Any opinions stated by users of this forum are NOT those of the site owners, each poster takes FULL responsibility for their own posts.